EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Holtec Signs Strategic Cooperation Agreement with Utah and Hi Tech Solutions to Deploy Nuclear SMRs

LCG, May 1, 2025--Holtec International (Holtec) announced the signing on April 29 of a strategic cooperation agreement with the State of Utah and Hi Tech Solutions, a leading nuclear services provider based in Kennewick, Washington, to collaborate in the deployment of Holtec's SMR-300s (small modular reactor) in Utah and the broader Mountain West region. Hi Tech will play a leading role in the project development and workforce training to support the rise of new nuclear power generation in the region.

Read more

EPA and Texas Railroad Commission Sign Memorandum of Agreement for Permitting Geologic Storage of Carbon Dioxide

LCG, April 29, 2025--Officials from the U.S. Environmental Protection Agency (EPA) and Texas Railroad Commission (RRC) signed a memorandum of agreement (MOA) today outlining the state’s plans to administer programs related to carbon storage wells, known as Class VI wells. The MOA signing is a required step in the RRC’s application to be granted authority to permit Class VI wells in the state of Texas. EPA is currently preparing a proposed approval of RRC’s primacy application.

Read more

Industry News

Innergex and BlackRock Announce Commercial Operation of the 200 MW Flat Top Wind Farm in Texas

LCG, March 28, 2018--Innergex Renewable Energy Inc. and BlackRock Real Assets announced the commissioning on March 23, 2018, of the 200-MW, Flat Top wind farm located in central Texas.

The Flat Top wind farm includes 100 Vestas V110 wind turbines that each have a nameplate capacity of 2.0 MW. Vestas will operate the wind farm under a 10-year operation and maintenance contract.The wind farm is located in Comanche and Mills Counties.

Innergex holds a 51 percent interest in the wind farm, which was acquired on February 6, 2018, as part of the acquisition of Alterra Power Corp. A fund managed by BlackRock Real Assets holds the remaining 49 percent. Alterra Power Corp. acquired the project in June 2016.

The President and Chief Executive Officer of Innergex stated,
"Innergex is proud to continue its core mission with the commissioning of another reliable, affordable, clean and renewable energy facility that will play a part in addressing global climate change. The commissioning of our second wind farm in Texas is a significant milestone in our strategy as we aim to increase our presence in the United States where we intend to bring more high-quality projects online in a near future."

"We are very pleased to invest in the Flat Top wind farm on behalf of our clients. This transaction demonstrates BlackRock's continued focus on renewable power investments, which currently amount to US$5 billion of equity assets under management," said the head of BlackRock Renewable Power Americas and APAC. "We continue to see the U.S. an attractive market for wind assets where BlackRock have invested in more than 30 wind and solar projects."
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service