|
News
|
LCG, October 23, 2026--INNIO N.V. yesterday announced a 620 MW follow-on order from a developer and operator of mega-scale data center campuses in the United States. Together with the customer's 1.1 GW order announced previously in July, the new order brings cumulative orders from the customer to approximately 1.72 GW this year.
Read more
|
|
LCG, October 21, 2026--The Nuclear Company today announced a proposed nuclear energy campus in Kentucky that could potentially provide 6.6 GW of electric generating capacity. The Prosperity One nuclear energy campus, located along the Ohio River in eastern Kentucky, could accommodate up to six Westinghouse AP1000 reactors and would be the largest nuclear power generation site in the nation if fully constructed.
Read more
|
|
|
Press Release
ERCOT 2018 Summer Quarter Outlook
LCG, July 16, 2018-- LCG released a new third quarter (July – August 2018) report that looks at how the ERCOT grid can cope with strained network conditions. Resource adequacy analysis for the region is especially important during extreme summer loading conditions. This summer the network is under particular scrutiny as the reserves have tightened because of recent retirements.
This report examines a Base Case, a High Generation Outage Case, a Low Wind Case and a High Load Case. It discusses which strained conditions might shift in the outlook for energy prices, Operating Reserve Demand Curve (ORDC), Peaker Net Margin (PNM), and congestion.
LCG performed this study using hourly dispatch and its proprietary UPLAN Network Power Model. LCG has been modeling energy systems for more than 30 years and continuously sustains the most up-to-date information on every detail of the Texas grid, from minor and major transmission upgrades to gas prices and weather patterns.
If you are interested in receiving the full summer quarter outlook, please contact us at julie.chien@energyonline.com. For more in depth analysis, LCG can provide tailored datasets, such as individualized generator performance, hourly prices, and much more.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|