EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

FERC and NERC Issue Joint Report on System Performance During the January 2025 Arctic Weather

LCG, April 17, 2025--The Federal Energy Regulatory Commission (FERC), the North American Electric Reliability Corporation (NERC), and its Regional Entities today issued a joint staff report concluding that the nation’s Bulk-Power System (BPS) "performed well during successive cold weather events in January 2025, without major issues in either the natural gas or electric systems."

Read more

Matrix Renewables Announces the Commissioning of Pleasant Valley Solar 1

LCG, April 15, 2025--Matrix Renewables announced today the successful commissioning of the Pleasant Valley Solar 1 power generation facility in Ada County, Idaho. The 200-MWac solar facility includes a Power Purchase Agreement (PPA) that was secured through negotiation with Meta and Idaho Power. Matrix Renewables states the facility is the largest operational solar facility in Idaho Power's system. Sundt Renewables, the Engineering, Procurement, and Construction (EPC) services provider, completed construction of the project on March 2nd.

Read more

Industry News

DTE, Entergy to Build 320 Megawatt Illinois Plant

LCG, May 31, 2001Subsidiaries of DTE Energy Inc. and Entergy Corp. said yesterday they would build a jointly-owned 320 megawatt natural gas-fueled power plant in the village of Crete, Ill., about 30 miles south of Chicago.

DTE Energy Services and Entergy Wholesale Operations said the plant could be built in about a year's time and have scheduled commercial operation for June 2002.

"The electric output from this facility will be available in time to supply additional electricity to theregion during high-demand periods next summer," said Barry G. Markowitz, president of DTE EnergyServices. "In addition to the power, the Crete plant will help fuel economic growth in the area as thefirst tenant in the Crete Industrial Park."

Natural gas delivery for the project will be provided through the recently completed Vector Interstate Pipeline. The Vector pipeline is partially owned by MCN Energy Inc., which will become part of DTE Energy as a result of a merger between the companies, expected to close May 31.

The new facility will be operated by Entergy Operating Systems Inc.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service