EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PJM Reports Resources Are Adequate to Meet Growing Summer Demand

LCG, May 7, 2026--PJM issued today its Summer Outlook 2026, which forecasts sufficient generation for typical peak demand this summer. PJM states that it is prepared to call on contracted demand response resources to reduce electricity use during times of high system stress.

Read more

NRC Approves Oklo's Principal Design Criteria Topical Report for Aurora Powerhouse

LCG, May 6, 2026--Oklo Inc. ("Oklo"), an advanced nuclear technology company, announced today that the U.S. Nuclear Regulatory Commission (NRC) has approved the Principal Design Criteria (PDC) topical report for the Aurora-INL (Idaho National Laboratory) nuclear small modular reactor (SMR), which is currently under construction in Idaho. The PDC topical report establishes a regulatory framework that defines the fundamental safety, reliability, and performance requirements to guide future reactor licensing and design activities, and the approved report should simplify future applications and reduce the need to re-review established material.

Read more

Industry News

Dominion Reviving Maryland-based LNG Terminal

LCG, July 22, 2003--The Cove Point liquid natural gas terminal in Maryland is being brought back into operation by Dominion Resources Inc., which is also considering expanding LNG operations to serve the "interstate pipeline grid," the company announced.

The terminal was shut in 1980, when LNG prices were prohibitively low. Dominion purchased the Cove Point facility from williams Cos. for $217 million last year, and has also spent $180 million to resuscitate it. Long-term agreements with BP Plc, Royal Dutch/Shell Group and Statoil ASA of Norway, which ship LNG, have been signed.

Cove Point is equipped with berths to convert frozen natural gas, stored 270 degrees Fahrenheit below zero, back into gaseous form from two tanker ships simultaneously. The LNG expands in volume by 600 times. The facility can release 1 billion cubic feet of gas daily, and can keep what amounts to 5 billion cubic feet of gas on-site. Plans are under consideration to add another tank, which would be able to hold LNG equivalent to 2.5 billion cubic feet of gas.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service