EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Calpine and ExxonMobil Sign CO2 Transportation and Storage Agreement for CCS Project in Texas

LCG, April 24, 2025--Exxon Mobil Corporation (ExxonMobil) announced yesterday an agreement with Calpine Corporation (Calpine) to transport and permanently store up to 2 million metric tons per annum (MTA) of CO2 from Calpine’s Baytown Energy Center, a natural gas-fired facility located near Houston, Texas. This is part of Calpine’s Baytown Carbon Capture and Storage (CCS) Project that is designed to add CCS for the facility’s CO2 emissions. The Calpine facility could then provide a 24/7 supply of low-carbon electricity to the Texas grid plus steam to nearby industrial facilities.

Read more

Doral Renewables Selects NovaSource as Partner to Deploy the 1.6-GWdc Mammoth Solar Project in Indiana

LCG, April 21, 2025--NovaSource Power Services ("NovaSource") recently announced that it has partnered with Doral Renewables and has been selected as the Operations and Maintenance ("O&M") and Generator Operator ("GO") for the Mammoth Solar Project, one of the largest agrivoltaics facilities in the United States.

Read more

Industry News

Dominion Reviving Maryland-based LNG Terminal

LCG, July 22, 2003--The Cove Point liquid natural gas terminal in Maryland is being brought back into operation by Dominion Resources Inc., which is also considering expanding LNG operations to serve the "interstate pipeline grid," the company announced.

The terminal was shut in 1980, when LNG prices were prohibitively low. Dominion purchased the Cove Point facility from williams Cos. for $217 million last year, and has also spent $180 million to resuscitate it. Long-term agreements with BP Plc, Royal Dutch/Shell Group and Statoil ASA of Norway, which ship LNG, have been signed.

Cove Point is equipped with berths to convert frozen natural gas, stored 270 degrees Fahrenheit below zero, back into gaseous form from two tanker ships simultaneously. The LNG expands in volume by 600 times. The facility can release 1 billion cubic feet of gas daily, and can keep what amounts to 5 billion cubic feet of gas on-site. Plans are under consideration to add another tank, which would be able to hold LNG equivalent to 2.5 billion cubic feet of gas.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service