EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Invenergy Announces New Agreements with Meta for Renewable Energy to Support Data Center Operations

LCG, June 26, 2025--Invenergy today announced that they and Meta Platforms, Inc. have signed four new clean energy agreements that total an additional 791 MW of procured solar and wind capacity to support Meta's near-term operations, data center growth, and clean energy goals.

Read more

New York Power Authority to Develop New Nuclear Facility in Upstate New York

LCG, June 23, 2025--The Governor of New York today directed the New York Power Authority (NYPA) to develop and construct an advanced nuclear power plant in upstate New York to deliver zero-emission power that supports a reliable and affordable electric grid. NYPA will lead the effort to develop at least one new nuclear energy facility with a combined capacity of at least one gigawatt (GW) of electricity, either alone or in partnership with private entities. The directive builds on the Governor’s 2025 State of the State to develop nuclear energy plans in New York.

Read more

Industry News

High-voltage Line Begins Operating Under Mississippi River

LCG, May 12, 2004--Entergy Louisiana, Inc., a unit of Entergy Corporation, announced today that it has begun operating a transmission line contained within a flexible sequence of pipes located 100 feet below the bed of the Mississippi River.

The line was developed as a way to allow larger shipping vessels to travel the river at New Orleans more easily. The transmission line is contained within 12 sections of pipe of different diameters, each made up of fused 50-foot sections. Installation work began last August with a horizontal drilling unit that created a tunnel, using a geographical positioning system for guidance. The pipes were then pulled through the tunnel, after which the line itself was pulled through the pipes.

The total length of the sections of pipe is 46,800 feet, while their total weight is 800,000 pounds. The cable, which is continuous (unspliced), weighs almost 1,000,000 pounds, and was made by J-Power Systems of Japan. During the installation work, transmission lines crossing the river and connected by transmission towers were raised to allow vessels to pass, without the need to systematically de-energize lines, as has been done regularly in the past.

"Our transmission engineers have written a new chapter in power industry history as they built on the company's record of supplying reliable power in a unique region both blessed and challenged by the constraints of natural boundaries and a rich but delicate ecosystem," J. Wayne Leonard, the chief executive officer of Entergy, said.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service