EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Georgia PSC Approves Georgia Power's 2019 IRP

LCG, July 18, 2019--The Georgia Public Service Commission (PSC) has unanimously approved Southern Company subsidiary Georgia Power's 2019 Integrated Resource Plan (IRP), which was submitted in late January.

The approved IRP calls for Georgia Power to retire five coal-fired units: Plant Hammond Units 1-4 near Rome, Georgia, and Plant McIntosh Unit 1 near Rincon, Georgia. The combined capacity of these coal units is approximately 980 MW. The company also will not renew its operating licenses for three small hydro plants: Estatoah, Langdale and Riverview.

Georgia Power had initially recommended adding 1,000 MW of renewable energy. In a stipulation agreement with Commission staff, that amount was increased to 1,650 MW. During Tuesday's hearing, the PSC Chairman made a motion to increase the renewable/solar energy procurement to 2,210 MW, the largest increase in renewable energy in Georgia's history. The five-member Commission voted unanimously for Chairman's motion. The final IRP decision also includes 50 MW of new competitively bid biomass generation (typically wood) was added.

"I determined Georgia has the ability to add significantly more renewable energy and solar energy using a market-based approach without any upward pressure on the rate payers and no state subsidies," the Chairman said.

The IRP calls for Georgia Power to own and operate 80 MW of battery energy storage systems (BESS), which will support the growth of intermittent or variable solar energy facilities and provide the company the opportunity to demonstrate the deployment, integration and operation of storage.

Georgia Power's senior vice president and senior production officer stated, "Working with the Georgia PSC, we are positioning Georgia as a leader in the Southeast in battery energy storage, which is critical to growing and maximizing the value of renewable energy for customers as we increase our renewable generation by 72 percent by 2024. Through the IRP process, Georgia Power will continue to invest in a diverse energy portfolio including the development of renewable resources in a way that benefits all customers to deliver clean, safe, reliable energy at rates that are well below the national average."
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service