EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Another Coal Plant Proposed for Colorado

LCG, October 13, 2004--Tri-State Generation and Transmission Association, Inc. announced it is accepting bids through November 22, 2004 for 1,000 MW of generating capacity in Colorado. Tri-State will evaluate the bids in early 2005 relative to developing their own 1,000 MW coal-fired plant. Given board approval, Tri-State plans for operations of the new plant to commence in 2011.

Public Service of Colorado (PSCo), a regulated affiliate of Xcel Energy, also plans to build a new coal plant in Colorado that would commence operations in 2009. PSCo submitted its Least-cost Resource Plan and requested a Certificate of Public Convenience and Necessity (CPCN) to build a 750 MW expansion of its Comanche Station - with a waiver from the competitive bidding process. A decision from the Commission regarding the waiver is expected to by November.

Tri-State, with headquarters in Westminster, Colorado, is owned by 44 rural electric systems that serve customers in Colorado, Wyoming, New Mexico and Nebraska. The Colorado Public Utilities Commission does not have jurisdiction over the Tri-State bidding process; however, the Commission states that Tri-State must seek Commission approval for construction.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service