|
News
|
LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.
Read more
|
|
LCG, November 5, 2026--NTT DATA, an AI, digital business and technology services company, today announced an agreement with Bloom Energy to deploy 900 MW of Bloom Energy's fuel cell technology to power multiple data center projects around the world. The agreement is Bloom Energy's largest international project to date.
Read more
|
|
|
Industry News
APS and Starwood Plan 290-MW Solar Project in Arizona
LCG, May 27, 2009--Arizona Public Service (APS) and Starwood Energy Group Global plan to construct a 290-MW concentrating solar plant (CSP) near Phoenix, Arizona. The Starwood Solar I plant is scheduled to be operational in 2013.
The facility will be designed, built and operated by Lockheed Martin, and it will be owned by an affiliate of Starwood Energy. APS will buy all of the electricity generated through a long-term purchase power agreement (PPA).
Starwood Solar I will employ a concentrated solar design that reflects solar energy with parabolic mirrors onto tubes filled with liquid. The heated liquid is used to convert water into steam that drives steam turbines that drive a generator.
The project includes a thermal storage system of molten salt to provide energy for power generation when direct solar energy is inadequate, which enables the plant to be dispatched when the sun is not shining. The project footprint covers a 1,900-acre site.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|