EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

In Memory of Rajat Deb: Inspiring Man of Ideas and Remarkable Silicon Valley Archetype

By Anjuli Deb -- With deep sadness and profound appreciation, we share the passing of LCG's founder, Dr. Rajat K. Deb. He was our president and one of the first entrepreneurs in the computer revolution. He was also our friend, our teacher and mentor, and for a few of us, our father and grandfather.

Read more

DOE Closes $1.9 Billion Loan to Restart Duane Arnold Nuclear Plant in Iowa

LCG, September 9, 2026--The U.S. Department of Energy’s (DOE) Office of Energy Dominance Financing (EDF) yesterday announced the financial close of a loan of up to $1.9 billion to NextEra Energy to support the finance of the restart of Iowa's only nuclear power plant, the Duane Arnold Energy Center. EDF has now financed three, carbon-free nuclear plant restarts and completed four concurrent conditional commitments and financial closings under the current Administration. This latest investment, along with the others, advance the Administration's energy dominance agenda and Executive Order, Reinvigorating the Nuclear Industrial Base.

Read more

Industry News

Iberdrola Commissions Three Wind Farms Across the U.S.

LCG, January 24, 2013--Iberdrola announced early this week that its installed capacity has increased by 265 MW following the commissioning of three wind farms located in California, New Hampshire, and Massachusetts.

The largest of the three wind farms is the 189-MW Manzana Wind Farm, located in the Tehachapi area near the town of Rosamond, California. The project includes 126 of GE's 1.5-MW wind turbines. San Diego Gas & Electric (SDG&E) has a 20-year power purchase agreement (PPA) for 100 MW of the plant output, and the City of Santa Clara?s Silicon Valley Power (SVP) has a 20-year PPA for 50 MW.

In New Hampshire, the 48-MW Groton Wind Farm is sited along two ridge features in the town of Groton and consists of 24 Gamesa G87, 2.0-MW wind turbines.

The third project is the 28.5-MW Hoosac Wind Power Project, located in Massachusetts. The project includes 19, 1.5-MW turbines from GE, and all of the energy is under a PPA with NSTAR Electric, a subsidiary of Northeast Utilities.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service