EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Releases January–March 2026 PJM Congestion Outlook Featuring Fundamentals-Based 3-Month Forecast

LCG, December 2, 2025 — LCG today announced the release of its PJM Congestion Outlook for January–March 2026, delivering a fundamentals-based, three-month forecast designed to help traders and risk managers better navigate congestion risks in PJM’s FTR markets.

Read more

DOE Selects TVA and Holtec to Rapidly Advance Deployment of Small Modular Reactors

LCG, December 2, 2025--The U.S. Department of Energy (DOE) today announced the selection of the Tennessee Valley Authority (TVA) and Holtec Government Services (Holtec) to support early deployments of advanced, light-water small modular reactors (SMRs) in the United States. With this announcement, DOE is supporting the first-mover teams to develop and construct the first Gen III+ small modular reactor (Gen III+ SMR) plants in the United States. The project teams will receive up to $800 million in federal cost-shared funding to advance initial projects in Tennessee (TVA) and Michigan (Holtec) and act to expand the Nation’s capacity while facilitating additional follow-on projects and associated supply chains.

Read more

Industry News

Alstom Completes Installation of 6-MW Offshore Wind Turbine

LCG, November 21, 2013--Alstom announced yesterday that it has completed the installation of its new offshore wind turbine, the 6-MW Haliade? 150, off Ostend harbor at the Belwind site in Belgium.

With the new offshore installation, Alstom achieves an important milestone in the industrialization process of its 6-MW turbine. The new turbine will now help to confirm how the machine behaves in the offshore environment for which it was specifically designed and developed.

The offshore wind turbine design includes: a 150-meter rotor, a direct drive (that eliminates a gearbox), and a permanent-magnet generator. The design is intended to improve efficiency and reliability, while reducing operating and maintenance costs.

The 61-meter jacket has been set on top of pillars sunk to a depth of over 60 meters. Then the three elements of the 78-meter tower were gradually assembled on the jacket. In all, the nacelle towers at a height of over 100 meters above sea level. The height of the Statue of Liberty, including the base, is 93 meters. The overall weight of the turbine and its structure totals 1,500 tonnes.








Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service