EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Florida Governor Approves New Nuclear Reactors at FPL's Turkey Point Power Plant

LCG, May 15, 2015-The Governor of Florida and the State Cabinet approved the request from Florida Power & Light Company (FPL) to install two new nuclear reactors at the company's Turkey Point Plant, located approximately 25 miles south of Miami, Florida. The project approved includes nearly 90 miles of transmission lines in Miami-Dade County. The approval is an important step forward to provide FPL the option to construct the non-carbon emitting reactors.

FPL continues to seek approval for the site, construction and operation from the United States Nuclear Regulatory Commission (NRC). FPL submitted its application to the NRC for a combined license (COL) for two Westinghouse Advanced Passive 1000 (AP1000) Pressurized Water Reactors (PWRs) in June 2009.

FPL has not decided to construct the two, 1,100-MW reactors, and the operational dates for the reactors would likely not be until approximately 2022 and 2023.

The existing Turkey Point Plant includes two natural gas/oil conventional steam units (Units 1 and 2), two nuclear units (Units 3 and 4), one combined cycle natural gas unit (Unit 5), and nine small diesel generators.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service